TY-522KWH-BESS
TAOYAN
TY522-2026
| Availability: | |
|---|---|
High-Efficiency LFP Energy Storage Solution with Smart EMS Control
| Module Capacity | 52.25 kWh (Total 522.5kWh) |
| Configuration | 52S1P (High-Density Design) |
| Nominal Voltage | 83.2V (Per Module) |
| Cell Specification | 314Ah Prismatic LFP Cell |
| Dimensions | 442*1050*235mm |
| Module Weight | Approx. 325KG |
| AC Rated Output Power | 250 KW |
| AC Max. Output Power | 260 KW |
| Rated Grid Voltage | 400.0V (Three-Phase) |
| Rated Frequency | 50/60Hz Self-Adaptive |
| Max. PV Input Voltage | 1000.0 V |
| MPPT Voltage Range | 250V - 850V |
Direct Connection to 250kVA Transformer Distribution (380V/440Vac AC-Coupled)





1. Is the 522kWh system suitable for factory peak shaving?
Yes, it's designed specifically for C&I peak shaving. The 250kW output helps industrial users significantly reduce peak demand charges and electricity costs.
2. What are the advantages of 314Ah LFP cells?
The 314Ah cells provide superior energy density and cycle life compared to 280Ah cells, allowing the 522kWh system to remain compact while extending the overall service life (up to 6000+ cycles).
3. Can the system be expanded?
Absolutely. The modular AC-coupled architecture supports parallel expansion to MW-scale storage as your factory energy needs grow.
4. How does the system handle thermal management for safety?
Our 522kWh BESS features an advanced industrial-grade air-cooling or optional liquid-cooling system combined with 24/7 BMS monitoring, ensuring all cells operate within their optimal temperature range to prevent thermal runaway.
5. Does this system support "Black Start" capabilities?
Yes, the 250kW PCS is equipped with black start functionality, allowing the system to restore power to critical factory loads independently during a total grid outage.
6. What international grid standards does the EnerCore meet?
The EnerCore series complies with major international standards including IEC 62619, UL 9540A, and CE, ensuring seamless grid connection and safety compliance in global markets.
7. How long is the typical installation time on-site?
Due to its pre-integrated "All-in-One" design, the system is shipped fully tested. On-site commissioning typically takes only 2-4 days, significantly reducing labor costs and downtime.
Safety & Fire Protection System
Quick Installation & Wiring Guide